site map | site search
 
Caledus  |  Brunel Oilfield Services  
   
 
  <Back | Centralizer Applications - Linear Centralisation

Customer

Location

Size

Deviation

Liner Length

TD

Rotation

Comments

Bapetco

(Shell JV)

Egypt :

BED 15-5

7 x 8 ¼

45 Deg

5000 ft

14000 ft

Yes

First well to be rotated in this area. Cement log (KSV) showed excellent cement job – ‘ best in three years in this area’

Talisman

UK :

Clyde A15

9 5/8 x 12

50 deg

17,800 ft

17,800 ft

N/A

Casing ran to TD no problems, with 11,000ft difficult open hole section. Excellent cement job.

Phillips

Norway :

Eldfisk A-24

5 1/2 x 8 ¼

Premium.

90 deg

3,240 ft

12,200 ft

Yes

Casing ran easily to TD, low torque figs during both cement job

( 12,000ftlbs), and start up (+ 2000lbs). Full rotation during cement job. Premium grade centralisers chosen for extra low torque and drag when using WBM.

BP

 

UK : West of Shetland

Schiehallion DW01

9 5/8 x 12

73 deg

12,506 ft

12,506 ft

N/A

First 9 5/8” casing completion from a semi-sub for Brunel. Casing ran easily to TD, during marginal weather conditions, and despite downhole losses. 7,553 ft open hole section.

Shell

UK

Brent Bravo, BB06s2

9 5/8 x 12

74 deg

11,200 ft

11,200 ft

N/A

Casing ran to TD and cemented no problems.

6,240ft open hole section.

Devon

China

Pearl River PY5-1-A02H

9 5/8 x 12

90 deg

8,780 ft

8,780 ft

N/A

Casing ran to TD and cemented, no problems.

CNR

 

UK

Tiffany A-05z

7 x 8 ¼

34 deg

2,160 ft

13,160 ft

Yes

Liner ran to TD no problems. Rotated during cement job

At 8K ft lbs.

 
© Web Design & Hosting by Internet Strategies FPAL supplier #10050220First Point Assessment Limited